Specifications & Details

Click on a links below or "right click" the links and choose "Save As" to download the files. (Some files are rather large and, consequently, might take a few seconds to load.)


Engineering Design Manual for Water & Sewer Systems


Engineering Design Manual for Water & Sewer Systems


Water & Sewer Details
  1. Water Details
  2. General Water Details Sheet 1
    General Water Details Sheet 2
    General Water Details Sheet 3
    General Water Details Sheet 4
    General Water Details Sheet 5
  3. Sewer Details
  4. General Sewer Details Sheet 1
    General Sewer Details Sheet 2
    General Sewer Details Sheet 3
    General Sewer Details Sheet 4
    General Sewer Details Sheet 5
  5. Water & Sewer Details
  6. General Water & Sewer Details Sheet 1
    General Water & Sewer Details Sheet 2
    General Water & Sewer Details Sheet 3
    General Water & Sewer Details Sheet 4
    General Water & Sewer Details Sheet 5
    General Water & Sewer Details Sheet 6
    General Water & Sewer Details Sheet 7

Pump Station Details
  1. Submittals Required for a Sewer Pump Station in Brunswick County
  2. Antenna Detail Sheet
  3. Pump Stations 50HP and Smaller (site layout)
  4. Pump Station <= 50HP Sheet 1
    Pump Station <= 50HP Sheet 2
    Pump Station <= 50HP Sheet 3
    Pump Station <= 50HP Sheet 4
  5. Pump Stations 50HP and Smaller (electrical)
  6. Pump Station <= 50HP Sheet 1
    Pump Station <= 50HP Sheet 2
    Pump Station <= 50HP Sheet 3
    Pump Station <= 50HP Sheet 4
  7. Pump Stations 50HP and Smaller (scada)
  8. Pump Station <= 50HP Sheet 1
    Pump Station <= 50HP Sheet 2
    Pump Station <= 50HP Sheet 3
    Pump Station <= 50HP Sheet 4
    Pump Station <= 50HP Sheet 5
  9. Pump Stations Larger than 50HP (site layout)
  10. Pump Station Larger than 50HP Sheet 1
    Pump Station Larger than 50HP Sheet 2
    Pump Station Larger than 50HP Sheet 3
  11. Pump Stations Larger than 50HP (electrical)
    Note: For 50 HP and larger pump stations the electrical design engineer will submit the building plans, pump electrical control drawings, Variable Frequency Drive (VFD) or Softstarts (RVSS) drawings, and any other required detail drawings for County Engineering and Utilities Department review and approval.
  12. Pump Stations Larger than 50HP with Soft Start Motor Controls (control panel)
  13. Pump Station Larger than 50HP RTU\Control Panel with Soft Starts Index Sheet
    Pump Station Larger than 50HP RTU\Control Panel with Soft Starts Sheet 1
    Pump Station Larger than 50HP RTU\Control Panel with Soft Starts Sheet 2
    Pump Station Larger than 50HP RTU\Control Panel with Soft Starts Sheet 3
    Pump Station Larger than 50HP RTU\Control Panel with Soft Starts Sheet 4
    Pump Station Larger than 50HP RTU\Control Panel with Soft Starts Sheet 5
    Pump Station Larger than 50HP RTU\Control Panel with Soft Starts Sheet 6
    Pump Station Larger than 50HP RTU\Control Panel with Soft Starts Sheet 7
    Pump Station Larger than 50HP RTU\Control Panel with Soft Starts Sheet 8
    Pump Station Larger than 50HP RTU\Control Panel with Soft Starts Sheet 9
    Pump Station Larger than 50HP RTU\Control Panel with Soft Starts Sheet 10
  14. Pump Stations Larger than 50HP with VFD's (control panel)
  15. Pump Station Larger than 50HP RTU\Control Panel with VFD Index Sheet
    Pump Station Larger than 50HP RTU\Control Panel with VFD Sheet 1
    Pump Station Larger than 50HP RTU\Control Panel with VFD Sheet 2
    Pump Station Larger than 50HP RTU\Control Panel with VFD Sheet 3
    Pump Station Larger than 50HP RTU\Control Panel with VFD Sheet 4
    Pump Station Larger than 50HP RTU\Control Panel with VFD Sheet 5
    Pump Station Larger than 50HP RTU\Control Panel with VFD Sheet 6
    Pump Station Larger than 50HP RTU\Control Panel with VFD Sheet 7
    Pump Station Larger than 50HP RTU\Control Panel with VFD Sheet 8
    Pump Station Larger than 50HP RTU\Control Panel with VFD Sheet 9
    Pump Station Larger than 50HP RTU\Control Panel with VFD Sheet 10

Wastewater Pumping Station Design

At the March 16th meeting of the Brunswick County Board of Commissioners, the Wastewater Pumping Station Design Guidelines were approved for use by engineers and developers in designing Wastewater Pumping Stations. Please contact the Engineering Department at 910-253-2500 if you have questions regarding the guidelines.

• Wastewater Pumping Station Design Guidelines: .pdf
• Pumping Station Design Spreadsheet: .xls
• Regional Pump Station Development Policy: .pdf
• Pumping Station Design Checklist: .xls
• Fast Track Audit Checklist: .pdf