Public Notice

Public Notice

System Pressure Advisory Rescinded: Part of Boiling Spring Lakes / El sistema a resumido sus servicios y operaciones normales

10.17.2018

Based on the laboratory analysis of water samples collected on October 17 and 18, 2018, water consumers of Brunswick County Public Utilities located in Boiling Spring Lakes on E. Boiling Spring Rd. and all connecting roads off E. Boiling Spring Rd. on both sides between North Lake Dr. and the dam, are hereby notified that it is no longer necessary to boil water or use bottled water for human consumption.

There are no longer any System Pressure Advisory for Brunswick County Public Utilities.

This notice is issued and effective October 19, 2018.

We appreciate your cooperation and patience during this period. If you have any questions, please do not hesitate to contact us.

 

John Nichols

Brunswick County Public Utilities

910-253-2657

 

Espanol

Basado en un estudio conducido en las muestras de agua, los clientes del Brunswick County Public Utilities que se encuentran el los siguietes pueblo Boiling Spring Lakes estan siendo notificados por este informe que lla no hay necesidad de continuar hirviedo el agua o usar agua enbotellada para consumer. El sistema a resumido sus servicios y operaciones normales.

NOTIFICATION: INSPECTIONS DAILY LIMIT

10.31.2017

TO:              ALL CONTRACTORS

FROM:        BRUNSWICK COUNTY CODE ADMINISTRATION                   

SUBJECT:   INSPECTIONS DAILY LIMIT

DATE:         10-30-17

 

Beginning November 15, 2017, Code Administration will initiate changes in our inspection scheduling program.  Whereas, currently unlimited inspections may be scheduled, as of November 15th, this will change to a limited number of inspections that can be scheduled per day.

When scheduling an inspection, you will need to choose a day from the drop-down list.  However, if that day’s number of inspections have been reached, you will need to choose another day from the drop-down list.  This will allow inspectors to complete their daily inspections without having to roll over inspection to the next day.