Annual Reports / Facilities Information

Advisories
News
Press Releases

Column 1 CTA

Gen-x/PFAS
Information

Column 2 CTA

UTILITY BILLING

Column 3 CTA

Water & Sewer Rates

Column 4 CTA

Annual Reports / Facilities Information

Water

Annual Permit to Operate – Water

Drinking Water Facilities and Permits

211 Water Treatment Facility

211 Water Treatment Facility

Last Updated: March 2020

•  6 MGD
•  Groundwater lime-softening plant

Permit – 211 wtp

Northwest Water Treatment Plant

Northwest Water Treatment Plant

Last Updated: March 2020

•  24 MGD
•  Surface Water Treatment Facility
•  2020 Northwest WTP Expansion Authorization to Construct (ATC)
•  LPRO Construction Costs, Milestones, and Updates

Wastewater

Wastewater Treatment Facilities and Permits

Carolina Shores

Carolina Shores Wastewater Treatment Plant

Last Updated: March 2020

•  0.530 MGD
•  Extended Aeration/Tertiary
•  NPDES (Discharge) Permit

Permit-Carolina Shores

Northeast Brunswick Regional

Northeast Brunswick Regional Water Reclamation Facility

Last Updated: March 2020

•  2.475 MGD (Currently under 2.5 mgd expansion)
•  Water Reclamation Facility
•  Extended Aeration/Tertiary/BNR
•  Solids Handling Operation (ATAD)
•  NPDES (Discharge) Permit

Permit – North East Brunswick Regional

Authorization to Construct

Ocean Isle Beach

Ocean Isle Beach Water Reclamation Facility

Last Updated: March 2020

•  1.050 MGD
•  Sequencing Batch Reactor (SBR)
•  Spray Irrigation — Non-Discharge

Permit – Ocean Isle Beach

Sea Trail

Sea Trail Wastewater Treatment Plant

Last Updated: March 2020

•  0.300 MGD (Permitted for 0.500 MGD)
•  Extended Aeration/Tertiary
•  (Spray Irrigation – Non-Discharge)

Permit – Sea Trail

Shallotte

Shallotte Wastewater Treatment Plant

Last Updated: March 2020

•  0.500 MGD
•  Facultative Lagoon/Spray Irrigation (Non-Discharge)

Permit – Shallotte

West Brunswick Regional

West Brunswick Regional Water Reclamation Facility

Last Updated: March 2020

•  6.0 MGD
•  Extended Aeration/Tertiary/BNR
•  Solids Handling Operation (ATAD)
•  Non-Discharge Permit (golf courses and dedicated drip irrigation, infiltration basins and surface irrigation)

Permit – West Brunswick Regional

Wastewater Collection and Treatment System Annual Reports

Wholesale Participants

Northeast Brunswick Regional Water Reclamation Facility

H2GO

West Brunswick Regional Water Reclamation Facility

Holden Beach
Oak Island
Shallotte

Ocean Isle Beach Water Reclamation Facility

Studies

Boiling Spring Lakes Sewer Master Plan

News & Events

Get the latest updates and happenings on events throughout the county.

Latest News

Read More Public Utilities News

Latest Events

//